Our Portfolio

EPC

SNCLIENTPROJECT SCOPECONTRACT NODESCRIPTIONYEARREMARK
1NLNGEPCB170030PPPREHABILITATION OF CORRODED INFRASTRUCTURE ON UNITS 4300/4500/46002022ONGOING

Civil

SNCLIENTPROJECT SCOPECONTRACT NODESCRIPTIONYEARREMARK
1SPDCCIVILEI2303CONSTRUCTION OF PERIMETER CONCRETE FIREBREAK AT EBUBU MANIFOLD2007COMPLETED
2SPDCCIVIL/MECHANICALNG01016015EPF PHASE 1 CIVIL AND MECHANICAL UPGRADE WORKS2013COMPLETED
3AGIPCIVIL5000014959PROVISION OF MINOR CIVIL WORKS AT NAOC2021ONGOING

Instrumentation

SNCLIENTPROJECT SCOPECONTRACT NODESCRIPTIONYEARREMARK
1SPDCINSTRUMENTIONNG01016078INSTRUMENT MODIFICATION WORKS AT SPDC LAND 1 EAST LOCATIONS2013COMPLETED
2SPDCINSTRUMENTNG01018690INSTRUMENTS MODIFICATION WORKS AT SPDC LAND 1 PH 2 EAST LOCATION2014COMPLETED
3SPDCINSTRUMENT/ELECTRICALNG01023543REPLACEMENT OF CONTROL PANEL FOR PH IA MEDICAL WASTE INCINERATOR2019COMPLETED
4SPDCINSTRUMENTATION/ELECTRICALNG01019962INSTRUMENTATION/ELECTRICAL MODIFICATION WORKS AT AGBADA/OBIGBO NODE AGG FACILITIES2015COMPLETED
5SPDCINSTRUMENTNG01020182INSTRUMENTS MODIFICATION WORKS AT SPDC LAND 2 EAST LOCATIONS2015COMPLETED

Metering

SNCLIENTPROJECT SCOPECONTRACT NODESCRIPTIONYEARREMARK
1SPDCMETERING SERVICESCW318160PROVISION OF METERING SERVICES, PROVING AND MAINTENANCE SUPPORT FOR WEST ASSET HUB2020ONGOING
2SPDCMETERING SERVICESNG01023056PROVISION OF PROVING/ CALIBRATION OF COROLIS METERS IN LAND EAST HUB FACILITIES2017COMPLETED

Remediation

SNCLIENTPROJECT SCOPECONTRACT NODESCRIPTIONYEARREMARK
1SPDCREMEDIALEH9027CLEANUP AND REMEDIATION WORK AT 2005-148 20" K/CRK-RUM T/L AT ODAU S12006COMPLETED
2SPDCREMEDIALEH9418SERVICES FOR CLEANUP/REM WORKS AT 2006_203 IMO RIVER II/SL S32007COMPLETED
3SPDCREMEDIAL WORKE11785SERVICES FOR CLEANUP/REM AT ADIBAWA 6" BULKLINE AT BISENI SITE 52007COMPLETED
4SPDCREMEDIAL WORKEH4932SERVICES FOR CLEANUP/REMEDIAL AT 20" KOLOC/RKP T/L AT OBEDUM SITE 122006COMPLETED
5SPDCREMEDIAL WORK4510277236OGONI FIELD BUSH CLEARING, TREE FALLING/CUTTING, REMOVAL OF STUMP AND DEBRIS2012COMPLETED
6SPDCREMEDIAL WORK451012379610" KC MAIFOLD AT ABALAMABIE2008COMPLETED
7SPDCREMEDIALEH5475FURNISHING OF B4-240 CONFERENCE ROOM IN SPDC IA2006COMPLETED
8SPDCREMEDIAL EH2413SUPPLY OF LABOUR AND MATERIAL FOR REMEDIATION AT KOM KOM SITE 1 & 22004COMPLETED
9SPDCREMEDIALE17520CLEANUP AND REMEDIATION OF IMPACTED AREAS AT 10" DIEBU CREEK-NUN RIVER DL @ IKIABIRI SITE 22006COMPLETED
10SPDCREMEDIAL4900000693BUSH CLEARING, TREE FELLING ETC2010COMPLETED
11SPDCREMEDIALEH9416SERVICES FOR CLEANUP/REMEDIAL WORKS AT 2006_203 IMOR II/SL SI2007COMPLETED
12SPDCREMEDIALEH4714CONSTRUCTION OF BLOCK WORK FENCING AT OBIGBO2006COMPLETED
13AGIPREMEDIAL WORKS5000019137PROVISION OF GLOBAL MAINTENANCE OF NAOC OFFICIAL AND RESIDENTIAL FACILITY/INFRASTRUCTURE IN ABUJA2022ONGOING

Mechanical

SNCLIENTPROJECT SCOPECONTRACT NODESCRIPTIONYEARREMARK
1SPDCMECHANICALNG01009744MECHANICAL MODIFICATION WORKS IN SPDC PRODUCTION ASSETS SWAMP2011COMPLETED
2SPDCMECHANICALNG01012492MECHANICAL MODIFICATION WORKS IN SPDC ASSETS EAST SWAMP2012COMPLETED
3SPDCMECHANICALNG01014697CONSTRUCTION/REPLACEMENT OF FLOWLINES IN NESI & NES2 AREAS2012COMPLETED
4SPDCMECHANICALNG01022346MECHANICAL MODIFICATION WORKS IN SPDC PRODUCTION ASSETS SWAMP2017COMPLETED
5SPDCMECHANICALNG01018897PSBR AND ENVIRONMENTAL UPGRADE WORKS IN NELS SWAMP LOCATION2014COMPLETED
6SPDCREMEDIAL WORKSEH9041SERVICES FOR CLEANUP/REM WORKS AT ODEMA WELL 9 FLOWLINE2006COMPLETED
7SPDCCIVIL/MECHANICAL/INSTRUMENT & ELECTRICALNG01016920CORPORATE SUBSTATION UPGRADE SERVICES FOR SPDC INFRASTRUCTURE IN PORT HARCOURT, FLBS AND LAGOS18/2020ONGOING
8SPDCMECHANICALNG01022276CONSTRUCTION, REPLACEMENT AND REPAIRS OF FLOWLINES IN SPDC LAND2018COMPLETED
9SPDCMECHANICALNG01017827CONSTRUCTION/REPLACEMENT OF FLOWLINES IN NESI & NES2 AREAS2014COMPLETED
10SPDCMECHANICALPROVISION OF WELLHEAD CELLAR UPGRADE WORKS AT NEL 2 DISTRICTS KOLOCREEK 16T2015COMPLETED
11SPDCMECHANICALNG01007432FLARE TIPS AND REMOTE IGNITION SYSTEM INSTALLATION FOR SWAMP 2 FIELD2010COMPLETED
12SPDCMECHANICALCW318970CONSTRUCTION, REPLACEMENT AND REPAIRS OF FLOWLINES IN SPDC SWAMP2020ONGOING
13AGIPMECHANICAL4600028686RENOVATION OF CARAVAN/CONSTRUCTION OF SHELTER2016COMPLETED
14SPDCMECHANICALNG01022357CONSTRUCTION, REPLACEMENT AND REPAIRS OF FLOWLINE IN SPDC SWAMP2017COMPLETED
15SPDCMECHANICALNG01018315INSTALLATION OF COLLAPSED FLARE STACK/WALKWAY, PILOT LINE & REMOTE IGINATION SYSTEM IN SWAMP 2 FIELD NEMBE 1,2,3,42014COMPLETED
16SPDCMECHANICALNG01018316INSTALLATION OF COLLAPSED FLARE STACK/WALKWAY, PILOT LINE & REMOTE IGINATION SYSTEM IN SWAMP 2 FIELD EKULAMA2014COMPLETED
17SPDCMECHANICALCW318974CONSTRUCTION, REPLACEMENT AND REPAIRS OF FLOWLINE IN SPDC SWAMP2020COMPLETED
18SPDCMECHANICALNG01022356CONSTRUCTION, REPLACEMENT AND REPAIRS OF FLOWLINE IN SPDC SWAMP2018COMPLETED
19SPDCMECHANICALNG01009250RECONSTRUCTION OF EKULAMA 2 FLOWSTATION FLARE BUNDWALL2010COMPLETED
20SPDCMECHANICALNG01012474FLARE TIPS AND REMOTE IGNITION SYSTEM INSTALLATION FOR SWAMP 2 FIELD2011COMPLETED
21SPDCMECHANICAL4510397835SECT. REPLACEMENT OF OTAM 5L F/L2018COMPLETED
22SPDCMECHANICAL4510400841REPAIR OF 2" FUEL GAS PIPING OBELE F/S2018COMPLETED
23SPDCMECHANICAL4510388895OTUMARA DRIP PANS REPAIR - HOECHY2017COMPLETED
24SPDCMECHANICAL4510390712CLOSE-OUT PUNCHLIST ACTIONS 18K COND OKGP 2017COMPLETED
25SPDCMECHANICAL4510397544IA SUB-1, 2 & 5 O/H TANKS REFURBISHMENT2018COMPLETED
26SPDCMECHANICAL4510389388SECT REPLACEMENT OF OTAM 5L F/L2017COMPLETED
27SPDCMECHANICAL4510389440SECT REPLACEMENT OF AGBADA 52GLL2017COMPLETED
28SPDCMECHANICAL4510401273OTUMARA TRAIN 3 REHAB WORK - HOECHY2018COMPLETED
29SPDCMECHANICAL4510367740OTU PUMP DISCHARGE HEADER WORK EXECUTION2016COMPLETED
30SPDCMECHANICAL4510346188FABRICATION OF SPOOLPIECE 3PCS2015COMPLETED
31SPDCMECHANICAL4510310281SAVER PIT AUTO DRAIN/RV INSTALL NUNR FS2013COMPLETED
32SPDCMECHANICAL4510310919BELEMA FS MECHANICAL / CORROSION WORKS2013COMPLETED
33SPDCMECHANICAL4510288046ADD WORK MECH MOD FOR EKU1 & 2 FS2013COMPLETED
34SPDCMECHANICAL4510354350STRCT INSTALLATION WORK FOR 5NO VESSELS2015COMPLETED
35SPDCMECHANICAL4510329407FLARE TIP & PILOT LINES INST AT BELE - A2014COMPLETED
36SPDCMECHANICAL4510288047ADD WORK MECH MOD FOR BELEMA FS2013COMPLETED
37SPDCMECHANICAL4510300886EPF PHASE 1 CIVIL AND MECHANICAL UPGRADE WORKS2013COMPLETED
38SPDCMECHANICAL4510302188EKULAMA 1 & 2 ADD CORROSION WORK2013COMPLETED
39SPDCMECHANICAL4510298309EKULAMA 1 FS CORROSION WORKS2013COMPLETED
40SPDCMECHANICAL4510367740OTU PUMP DISCHARGE HEADER WORK EXECUTION2016COMPLETED
41SPDCMECHANICAL4510335970YARD FABR FOR FLKO PIPING DIEBU CREEK FS2014COMPLETED
42SPDCMECHANICAL4510329233SOKU WH PLATFORM REFURB. - 11 NOS.(A)2014COMPLETED
43SPDCMECHANICAL4510323291BELEMA WH PLATFORM REFURBISHMENT - 3 NOS2014COMPLETED
44SPDCMECHANICAL4510318397XTRA WORK ON NEMC WH PLATFM REFURB.2014COMPLETED
45SPDCMECHANICAL4510317380CLOSED DRAIN PLATFORM DECK2014COMPLETED
46SPDCMECHANICAL4510261724FLARE TIP & RIS INST FOR SWP 2 - NEMBE 12014COMPLETED
47SPDCMECHANICAL4510250636NUNR W15S FLOWLINE LEAK CLAMPING2012COMPLETED
48SPDCMECHANICAL4510251312FLARE TIP & RIS INST FOR SWP2 - NEMBE 42012COMPLETED
49SPDCMECHANICAL4510209312REPLACEMENT OF FLARE TIPS IN CAWC 22010COMPLETED
50SPDCMECHANICAL4510295274FLARE/WALKWAY/PILOT & RIS INSTAL AT EKU2013COMPLETED
51SPDCMECHANICAL4510313917COMPLETION PO ODEC COR/S/BAR WORKS2013COMPLETED
52SPDCMECHANICAL4510329267SOKU WH PLATFORM REFURB. - 11 NOS.(B)2014COMPLETED
53SPDCMECHANICAL4510316074ADDITIONAL WORK ODECK UNDERDECK CORROSIO2014COMPLETED
54SPDCMECHANICAL4510205389FLARE TIP INSTALL AT NEMBE 2 FLOW - 22010COMPLETED
55SPDCMECHANICAL45102257303NOS EXHAUST PIPING MOD AT DIEBU CRK F/S2011COMPLETED
56SPDCMECHANICAL4510243562PIPING FAB-PD METER, PUMP RELIEF DBUC FS2011COMPLETED
57SPDCMECHANICAL4510237384T&P COMPENSATOR INSTALL LP FLARE DIEBU C2011COMPLETED
58SPDCMECHANICAL4510196246FLARESTACK REPLACEMENT AT NEMBE FS2010COMPLETED
59SPDCMECHANICAL4510222699FLARE WORK IN BONNY FS2011COMPLETED
60SPDCMECHANICAL4510229270FLARE TIP & RIS INSTALL AT EKU 1 F/S2011COMPLETED
61SPDCMECHANICAL4510297902NEMBE FLOWLINE RISERS REPLACEMENT2013COMPLETED
62SPDCMECHANICAL4510297901NEMBE WELLHEAD PLATFORM MODIFICATION2013COMPLETED
63SPDCMECHANICAL4510313918ODEC UNDERDECK CORROSION/S/BAR W/14 WORK2013COMPLETED
64SPDCMECHANICAL4510298310EKULAMA 2 FS CORROSION WORKS2013COMPLETED
65SPDCMECHANICAL4510272379MECH. MOD. WORK AT BELEMA, EKU 1 & 2 FS2012COMPLETED
66NLNGEPCB170030PPPREHABILITATION OF CORRODED INFRASTRUCTURE ON UNITS 4300/4500/4600 AND PROVISION OF SECURED ACID HANDLING SYSTEM2022ONGOING
67AGIPCIVIL5000014959PROVISION OF MINOR CIVIL WORKS AT NAOC 2021ONGOING
68AGIPMECHANICAL5000017242FLOWLINE/PIPELINE SECTIONAL REPLACEMENT SWAMP2021ONGOING
69AGIPMECHANICAL4600037648EBOCHA 5T FLOWLINE REPLACEMENT WORKS2019COMPLETED
70PANASONICPROCUREMENT45982SUPPLY OF PRINTER ACCESSORIES2001COMPLETED
71SPDCMECHANICAL45103294074FLARE TIP AND PILOT LINES INSTALLATION IN BELEMA2014COMPLETED
72SPDCMECHANICAL4510354350STRCT INSTALLATION WORK FOR 5NO VESSELS2015COMPLETED
73SPDCMECHANICAL4510367273WELLHEAD CELLAR UPGRADE2016COMPLETED
74SPDCMECHANICAL4510344994WELLHEAD CELLAR UPGRADE WORKS W7 AHIACOMPLETED
75SPDCMECHANICAL4510384657WELL HEAD CELLER UPGRADE AGBADA3,4 & OBEI 3L,52017COMPLETED
76SPDCMECHANICAL4510442285KANBO 5L FLOWLINE SECTIONAL REPLACEMENT2020COMPLETED
77AGIPMECHANICAL5000017242FLOWLINE/PIPELINE SECTIONAL REPLACEMENT SWAMP2021ONGOING
78SPDCMECHANICALNG01020329PROVISION OF PSBR & ENVIRONMENTAL UPGRADE WORKS IN NELS SWAMP LOCATION2016COMPLETED
79SPDCMECHANICALNG01022363CONSTRUCTION, REPLACEMENT AND REPAIRS OF FLOWLINE IN SPDC SWAMP2018COMPLETED
80SPDCSTRUCTURALNG01022128MECHANICAL MODIFICATION WORK IN SPDC PRODUCING ASSETS LAND ASSEST2018COMPLETED
81SPDCSTRUCTURALNG01015879INSTALLATION OF COLLAPSED FLARE STACK/WALKWAY PILOT LINE AND REMOTE IGNITION SYSTEM IN SWAMP 2 FIELD NEMBE2014COMPLETED
82SPDCSTRUCTURALNG01016025MECHANICAL MODIFICATION WORK IN SWAMP 1 & 2 EAST2014COMPLETED
83SPDCSTRUCTURALNG01015878INSTALLATION OF COLLAPSED FLARE STACK/WALKWAY PILOT LINE AND REMOTE IGNITION SYSTEM IN SWAMP 2 FIELD EKULAMA AND BELEMA2014COMPLETED
84TOTALSTRUCTURAAL4560156097/4560156098PROVISION OF OML 102 - OFP1 SEA WATER LIFT PUMP CAISSON REPLACEMENT2020ONGOING
85SPDCSTRUCTURALNG01022319MECHANICAL MODIFICATION WORKS IN SPDC PRODUCING ASSET LAND2018COMPLETED
86SPDCSTRUCTURALNG01010337REPLACEMENT OF COLLAPSED FLARE STACKS, WALKWAYS AND RIS IN SWAMP 1 EAST2012COMPLETED
87SPDCSTRUCTURALNG01012457FLARE TIPS AND REMOTE IGNITION SYSTEM INSTALLATION FOR SWAMP 2 FIELD (NEMBE 1, 2, 3, & 4)2012COMPLETED
88SPDCSTRUCTURALNG01010941FLARE TIPS AND REMOTE IGNITION SYSTEM INSTALLATION FOR EKULAMA2011COMPLETED
89SPDCSTRUCTURALNG01016027MECHANICAL MODIFICATION WORKS IN SWAMP 1 & 2 EAST2013COMPLETED
90SPDCSTRUCTURALNG01022365FLARES AND RIS UPGRADE WORKS IN SPDC PRODUCING ASSETS - SWAMP2017COMPLETED
91SPDCSTRUCTURALNG01008097REPLACEMENT OF COLLAPSED FLARE STACKS, WALKWAYS AND RIS IN SWAMP 1 EAST B2010COMPLETED
92SPDCSTRUCTURALNG01015187MECHANICAL MODIFICATION AND ENVIRONMENT UPGRADE WORKS IN NELS SWAMP LOCATION2013COMPLETED

Supply

SNCLIENTPROJECT SCOPECONTRACT NODESCRIPTIONYEARREMARK
1NNPCSUPPLYOO84006SUPPLY OF BEVERAGES2001COMPLETED
2NNPCSUPPLYOO84112SUPPLY OF BEVERAGES2001COMPLETED
3NNPCSUPPLYOO83271SUPPLY OF BEVERAGES2002COMPLETED
4NNPCSUPPLYOO84038SUPPLY OF FOOD STUUFS2001COMPLETED
5NNPCSUPPLYOO84042SUPPLY OF FOOD STUUFS2001COMPLETED
6SPDCPROCUREMENT4510147172PROCUREMENT OF 500KVA TRANSFORMER AT ONNE COMMUNITY2008COMPLETED

Water

SNCLIENTPROJECT SCOPECONTRACT NODESCRIPTIONYEARREMARK
1SPDCWATER BOREHOLENG0101315WATER BOREHOLE DRILLING IN LAND LOCATIONS 2012COMPLETED
2SPDCWATER BOREHOLE4900015684PROVISION OF BOREHOLE AND WATER RETICULATION SYSTEM MAINTENANCE SERVICES IN SPDC EASTERN DIVISION2013COMPLETED
3SPDCWATER BOREHOLENG01014160PROVISION OF BOREHOLE AND WATER RETICULATION SYSTEM MAINTENANCE SERVICES IN SPDC EASTERN DIVISION2012COMPLETED
4SPDCWATER BOREHOLENG01011705WATER BOREHOLE DRILLING ON GBARAN VZTX1 LOCATION2011COMPLETED
5SPDCWATER BOREHOLENG01011704DRILLING OF WATER BOREHOLE ON GBARAN VDTQ LOCATION2012COMPLETED
6SPDCWATER BOREHOLENG01018340REPLACEMENT OF WATER STORAGE TANKS IN GBARAN UBIE, KOLO CREEK, ODEAMA AND NKALI2015COMPLETED
7SPDCREMEDIALNG01011541REHABILITATION OF RA & IA SWIMMINING POOL TREATMENT PLANTS2012COMPLETED
8SPDCWATER SERVICESNG02001924STOCKING AND SUPPLY OF WATER TREATMENT CHEMICALS2011COMPLETED
9SPDCWATER SERVICESNG01004829STOCKING AND SUPPLY OF WATER TREATMENT CHEMICALS2009COMPLETED
10SPDCWATER SERVICESNG01019132STOCKING AND SUPPLY OF WATER TREATMENT CHEMICALS2014COMPLETED
11SPDCWATER BOREHOLEADDENDUMCALL OFF CONTRACTS FOR BOREHOLE MAINTENANCE AND WATER RETICULATION SYSTEMS MTC2009COMPLETED
12SPDCWATER SERVICESNG01021867REHABILITATION OF WATER STORAGE TANKS IN SPDC2016COMPLETED
13SPDCWATER BOREHOLENG01008685DRILLING OF WATER BOREHOLE AT ETELEBOU2010COMPLETED
14SPDCWATER BOREHOLENG01008751DRILLING OF WATER BOREHOLE AT AGBADA NHSV32010COMPLETED
15SPDCWATER BOREHOLENG01011617DRILLING OF WATER BOREHOLE AT AFAM 16 LOCATION2011COMPLETED

Electrical

SNCLIENTPROJECT SCOPECONTRACT NODESCRIPTIONYEARREMARK
1SPDCELECTRICAL4510235221SUPPLY OF ELECTRICAL POWER TO CAMERON WELLHEAD2011COMPLETED
2SPDCELECTRICAL4510243486UPGRADE OF IV SWITCHGEARS NUN RIVER FLB/FS 2011COMPLETED
3SPDCELECTRICAL4510261415UPGRADE OF LIGHTING PROTECTION SYSTEM UMUECHEM FLOW STATION2012COMPLETED
4SPDCELECTRICAL4510327330REQUEST FOR CABLE LAYING FOR CAWF22014COMPLETED
5SPDCELECTRICAL4510321153INSTALLATION OF CABLES AND POWER TRANSFORMER AT IMO RIVER 1 F/S2014COMPLETED
6SPDCELECTRICAL4510328053CABLE LAYING FOR HOOK-UP OF CC2 TO FLB D2014COMPLETED
7SPDCELECTRICAL4510311306POWERING AND EARTHING OF BONNY OIL TERMINAL2013COMPLETED
8SPDCELECTRICAL4510363110GBARAN SHUTDOWN PACO WORKS2016COMPLETED
9SPDCELECTRICAL4510337496IMO RIVER PROJECT SUPPORT EARTH WORKS2014COMPLETED
10SPDCELECTRICAL4510334024OKOLOMA CONDENSATE PRJOJCET MAT AND SERV 2014COMPLETED
11SPDCELECTRICAL4510363480FOT VESDA INSTALL AND INTEGRATION WORKS2016COMPLETED
12SPDCELECTRICAL4510341702OKOLOMA CONDENSATE EVACUATION PUMP2014COMPLETED
13SPDCELECTRICAL4510306270DIEBU CREEK INSTRUMENT AIR LINE PURGING2013COMPLETED
14SPDCELECTRICAL4510251983PROVISION OF FIRECOVER DIEBU CREEK FLOW STATION2012COMPLETED
15SPDCELECTRICAL4510311711PROCUREMENT OF MATERIALS AND INSTRUMENT WORKS2013COMPLETED
16SPDCELECTRICAL4510202945PERIMETER LIGHTING AT UMUECHEM FLOW STATION2010COMPLETED
17SPDCELECTRICAL4510382275OKGP 18K PUMP PACO WORKS2017COMPLETED
18SPDCELECTRICAL4510227245MODIFICATION AND RELOCATION OF USM AT DIEBU CREEK2011COMPLETED
19SPDCELECTRICAL45103908176M MAINTENANCE FACILITY EARTHING2017COMPLETED
20SPDCELECTRICAL4510319809INSTRUMENT MATERIALS AND SERVICES2014COMPLETED
21SPDCELECTRICAL4510304766OBIIGBO WIP MATERIALS AND SERVICES BREAKDOWN2013COMPLETED
22SPDCELECTRICAL4510299372MATERIAL AND INSTALL WORKS FOR AGBADA AGG WORKS2013COMPLETED
23SPDCELECTRICAL4510236157T & P COMPENSATOR INSTALL HP FLARE DIEBU C2011COMPLETED
24SPDCELECTRICAL4510361003GBARAN OPGD REPAIR WORKS2016COMPLETED
25SPDCELECTRICAL4510421970IA SUBSTATION 8 UPGRADE WORKS2019COMPLETED
26SPDCELECTRICAL4510423624IA SUBSTATION 8 UPGRADE WORKS - PHASE 22019COMPLETED
27SPDCELECTRICAL4510428322MAINTENANCE OF THE FMH HT PANEL2019COMPLETED
28SPDCELECTRICAL4510428443PROCEDURE AND INSTALL HT BREAKER FOR FMH2019COMPLETED
29SPDCELECTRICAL4510404930REPLACEMENT OF CONTROL PANEL AT MWI2018COMPLETED
30SPDCELECTRICAL4510427226IA SUBSTATION 8 WORKS - ELECT. MTO2019COMPLETED
31SPDCELECTRICAL4510426317HV NETWORK CABLE REPLACEMENT 2019COMPLETED
32SPDCELECTRICAL4510419981REFURBISHMENT OF SUBSTATION FACILITIES2019COMPLETED
33SPDCELECTRICAL4510427372A SUBSTATION 8 MILESTONE SCHEDULE (PR-32019COMPLETED
34SPDCELECTRICAL4510428760REPLACEMENT OF FAILED HV CABLE2019COMPLETED
35SPDCELECTRICAL4510429062INSTALLATION OF EARTH PIT AT NUNR2019COMPLETED
36SPDCELECTRICAL4510428777HV INTENVENTION / REPAIR WORK2019COMPLETED
37SPDCELECTRICAL4510429078ELECTRICAL UPGRADE OG OBIGBO PKBS2019COMPLETED
38SPDCELECTRICAL451042988611KV 2ND IA /RA NETWORK2019COMPLETED
39SPDCELECTRICAL4510429762POWER HOOK FOR OBIGHO ACCOMENDATION2019COMPLETED
40SPDCELECTRICAL4510430115HV INTERCONNECTOR CABLE REPAIRS2019COMPLETED
41SPDCELECTRICAL4510432013OVERHAUL OF D3508 GEN SET2020COMPLETED
42SPDCELECTRICAL4510430976INSPECTION OF VERTICAL FLARE PILOT LINE2020COMPLETED
43SPDCELECTRICAL4510397395REMEDIAL ACTIONS ON EARTHING SYSTEM2018COMPLETED
44SPDCELECTRICAL45103920876M INSTRUMENT CHKS-F/ST & PNEU G/P METER SYSTEM2017COMPLETED
45SPDCELECTRICAL4510311294PROCUREMENT OF 26" PIPE NEMC 26t2013COMPLETED
46SPDCELECTRICAL4510362852OKGP COND. EVAC. OPT PROJECT 18K PUMP PACO2016COMPLETED
47SPDCELECTRICAL4510303557BELEMA FLOWSTATION CORRODED WALKWAY REPLACEMENT2013COMPLETED
48SPDCELECTRICALNG01022423EARTHING AND LIGHTNING SYSTEM PROTECTION AT FORCADOS2017COMPLETED
49SPDCELECTRICALNG01008142INSTALLATION OF PERIMETER LIGHTING AT UMUECHEM FLOWSTATION2010COMPLETED
50SPDCELECTRICALNG01011146SUPPLY OF ELECTRICAL POWER TO CAMERON WELLHEAD CONTROL PANEL AT VARIOUS NAG WELLS AT GBARAN PROJECT2011COMPLETED
51SPDCELECTRICALNG01013177UPGRADE OF DEFECTED LIGHTNING PROTECTION SYSTEMS AT UMUECHEM FLOWSTATION2012COMPLETED
52DELGAELECTRICALYAI/BILLE/1/14BILLE ELECTRICITY SYSTEM UPGRADE2014COMPLETED
53SPDCELECTRICAL4510313006BELEMA FLOWSTATION MECHANICAL/CORROSION WORKS2013COMPLETED
54SPDCELECTRICALNG01016492ELECTRICAL FACILITY UPGRADE WORKS IN SWAMP 1&2 EAST2013COMPLETED
55SPDCELECTRICALCW26469933KV HV POWER TRANSMISSION LINES ELECTRICAL SUPPORT SERVICES CONTRACT FOR FORCADOS TERMINAL AND SOUTHBANKS2021ONGOING
56SPDCELECTRICALNG01012138UPGRADE OF LV SWITCHDEARS AT NUN RIVER FLB AND FS2011COMPLETED